In the specific circumstances of the current construction market using a large number of dispatched laborers, we require the labor department to do a good job in the certification of the dispatched personnel and the level of skill, as well as the ability to select and train from the organic workers. Management of the field captain. Intensive training for the machine operators on the way forward, so that they have a better understanding and mastery of the structure, performance and safe operation of mechanical equipment. During the construction, strengthen routine inspections and strictly implement various operational procedures. It laid the foundation for the safe operation of the construction elevator and ensured safe operation until the project was successfully completed. Quality service to the project is the purpose of our company. Failure of mechanical use must be eliminated in a timely manner and does not affect the construction on site. To this end, we have selected 2 experienced mechanical and electrical professional maintenance personnel to be stationed at the site. Every day, various types of fasteners, safety devices, rollers and other transmission parts, and various fasteners are inspected to ensure the normal operation of the equipment.
The construction practice tells us that in the operation and use stage of the elevator, the on-site management personnel must do the following supervision and guidance work: During the use of the construction elevator, the construction personnel must consciously accept the supervision and supervision of the supervisors, strictly abide by the existing management system of various types of construction elevators, and clearly define the safety. Use and manage accountability. Strengthen the management of labor service teams, strictly guard against loopholes in the process of staff deployment; strengthen the safety of operators and daily education, and strictly check the operation certificates of operators, and prohibit unlicensed operation and drinking operations. Supervise the operators to do pre-class inspections. The main contents of the inspection are: no-load and full load test operation, check the sensitivity and reliability of the brake. After confirming normal, it can be officially run and the inspection record will be made. Check the cage door and bottom cage door interlocking device at any time. It can only be activated when the cage door and the bottom cage door are safely closed, to prevent personnel from falling and material falling. Strictly check the weight of the cage, and no weight is prohibited. Check if the grounding protection and lightning protection device are in compliance with the requirements.
Pvc Piled Up Door,High Speed Pvc Stacking Door,Pvc Folding Up Door,Pvc Fabric Piled Up High Speed Door
Dongguan HengTaichang Doors Co, Ltd. , https://www.dghtcdoor.com