Analyze the steps of home heating installation

The importance of modern home heating is self-evident, green, environmental protection, energy conservation are the mainstream of modern heating home, led by the mainstream direction of the quality of heating products are gradually increasing, more innovative product installation technology The requirements are high. What are the installation steps for the analysis of new radiators in the top ten brands of Beijing radiators today?

Step 1: Slot the floor or wall. In order to hide the exposed plumbing pipes, the construction team must slot the walls and the floor. The depth or width of the slots requires special installation personnel to collect the actual treatment.

The second step: lay the pipeline and protect the card slot. According to the position of the previous heat sink, the slot is laid and the branch pipe is laid. According to the customer's demand, the pipe can be laid in the branch pipe to protect the pipe, and the system closes the water and suppresses the pressure.

The third step: install the manifold. The water separator is a water flow distribution and collection device composed of a water separator and a water collector. Diverter installation should be level.

Step 4: Pressure test the radiator. This is a very important step in the radiator installation procedure. The specific operation is to close the main valve and open the radiator inlet valve to test with the pressure test equipment. The experimental pressure should be 1.5 times the normal operating pressure and not less than the entire area. The experimental pressure of the pipe network is 3-5 minutes without leakage.

Step 5: Install the radiator. Place the radiators in a stable position, connect the valve connector with the inlet and outlet valves, measure the radiator straight with a level gauge, and check that the piping installation meets the requirements. Then use a pipe wrench to tighten the connectors.

Sixth: Customers check and accept the entire system of radiators. Usually during the replacement construction, workers will set aside valves on the pipeline. After installation, a stamping test shall be carried out to prove that no run, place of emergence, dripping, or leakage can be accepted.

Seventh: The installation of the radiator system is completed. The entire radiator installation step is completed, users can successfully enter the use phase.

LED Flood Light

The LED Floodlight is widely used at Garden, Park outside of shopping mall and so on.


The advantages for DiLin LED Floodlight

1. Fashion design with high quality of aluminum housing and constuction to make sure the cooling of LED Floodlight good enough.

2. Private module with high quality of COB & SMD CHIP and driver solution to make sure LED Floodlight quality stable enough.

3. Strong Engineer & QC team are good at customizing and offer flexible solution for competitive Floodlight.

4. Fast lead time: 5-7days for samples and 15-25days for bulk order.

5. 3 or 5 year warranty with standardized after-sale serivce process.

Led Flood Light,Led Flood Light 50W,Led Flood Light 200W,Led Flood Light Marine

Jiangmen Dilin Lighting High-Tech Co., Ltd. , https://www.jmdilinlight.com