Laminate flooring installation diagram (Photos)

539) {this.resized=true; this.width=539;}" border=0>

1, the required tools: data, hammer, ruler, floor glue, rope, pencils, mallets, special fasteners.


539) {this.resized=true; this.width=539;}" border=0>

2. Before the installation, check whether the door can be opened freely. If not, set the thickness of the lower edge of the door. Before the floor is installed, a layer of non-woven fabric or thin foam film, felt or the like is laid on the floor as required to provide better sound insulation and moisture proof effects. Note that the laying direction of the cushion needs to be at right angles to the floor.


539) {this.resized=true; this.width=539;}" border=0>

3. Place the position of the first board in the corner of the wall, cut the groove to the wall, and leave a 8-10mm expansion joint with a wooden wedge.


539) {this.resized=true; this.width=539;}" border=0>

4. When installing a row next to a wall to the last piece in this way, the vacant floor size can be obtained as shown in the figure. Take one whole board, place it in parallel with the previous one, leave 8-10mm expansion joints on the end of the wall and scribe it down to the end of the line. If the length of the remaining sheet is more than 40cm, it can be used in the next row.


539) {this.resized=true; this.width=539;}" border=0>

5. Starting from the second row, the upper end of the hammer head and the lower edge of the notch should be evenly coated with special glue for the floor (the first line should not be glued, lock the floor or coat the upper end of the notch). After the local board is installed, use a damp cloth. Timely paddle spilled part of the glue wiped.


539) {this.resized=true; this.width=539;}" border=0>

6. Tap the floor lightly with a hammer and mallet.


539) {this.resized=true; this.width=539;}" border=0>

7, after the first two rows of equipment, timely calibration with a rope or ruler.


539) {this.resized=true; this.width=539;}" border=0>

8. When installing the last line, take an entire board, place it on the mounted floor, align it up and down, then take another floor and put it on this block. One end is against the wall, then the line is drawn, and follow the line (Note: Leave 8-10mm expansion joints, which is the required width floor).


539) {this.resized=true; this.width=539;}" border=0>

9, when installed to the last row of boards, first put a good wooden block, with special fasteners to squeeze the floor, after installation, wait for 2 hours, withdraw wooden block.


539) {this.resized=true; this.width=539;}" border=0>

10. If there is a pipe protruding from the ground during installation, a hole must be made in the plate. Its diameter is at least 8-10mm larger than the diameter of the pipe. According to the cut surface, it should be at an angle of 45 degrees with the plate surface.

Nature floor del floor