FNZ-II Generator Rotor AC Impedance and Power Loss Tester is a new generation of enhanced AC Impedance Tester introduced by Yangzhou Ficut Electric Co., Ltd. on the basis of FNZ-I type. "Single-key shuttle" (rotate the mouse) technology, simple and convenient operation, canceled the panel buttons and other conventional controls. The instrument uses today's advanced high-speed microprocessor technology, features more powerful, superior performance, high reliability, easy operation, high precision, compact and lightweight. Currently in the country at the lin level.
Generator Rotor AC Impedance Tester Cautions for Use 1. Before using the instrument, read the product instruction manual carefully to understand the correct method of use.
2. Correct wiring during the test. Check the wiring is correct, reliable connection can be energized.
3. In the two wires of the test clamp, the thicker wires are current wires (I1, I2), and the finer wires are voltage wires (U1, U2). This instrument uses a dedicated high-current quick connector, which should be rotated slightly when plugging or unplugging.
4, correct operation. During the test, the pressure regulator should be evenly and slowly boosted near the test point to ensure the reliability of data collection.
5. If there is a protective action during the test, it must be ascertained that the abnormality has been eliminated before continuing the test. Do not operate blindly so as to avoid unnecessary losses.
Generator Rotor AC Impedance Tester Cautions for Use 1. Before using the instrument, read the product instruction manual carefully to understand the correct method of use.
2. Correct wiring during the test. Check the wiring is correct, reliable connection can be energized.
3. In the two wires of the test clamp, the thicker wires are current wires (I1, I2), and the finer wires are voltage wires (U1, U2). This instrument uses a dedicated high-current quick connector, which should be rotated slightly when plugging or unplugging.
4, correct operation. During the test, the pressure regulator should be evenly and slowly boosted near the test point to ensure the reliability of data collection.
5. If there is a protective action during the test, it must be ascertained that the abnormality has been eliminated before continuing the test. Do not operate blindly so as to avoid unnecessary losses.