Abstract On March 25, 2014, the main project of the second phase of Zhengzhou Jinhaiwei Technology Industrial Co., Ltd. was successfully capped. The second phase of the project has a total construction area of ​​4702.9 square meters. The electronic assembly workshop (1) has six floors and the electronic assembly workshop (2) has four floors. The main body of the project...

On March 25, 2014, the main project of the second phase of Zhengzhou Jinhaiwei Technology Industrial Co., Ltd. was successfully capped. The second phase of the project has a total construction area of ​​4702.9 square meters. The electronic assembly workshop (1) has six floors and the electronic assembly workshop (2) has four floors.
The capping of the main structure of the project also marks the official transfer of the project into the masonry, secondary structure and decoration and construction phases. The second phase of the project is expected to be completed in September 2014 for installation, interior and exterior decoration and environmental support, and will be delivered for use.
The exterior of the outdoor wall lamp is beautiful, with simple and beautiful lines. Various styles and forms, simple installation and convenient maintenance.
Outdoor Wall Light,Outdoor Wall Lamp,Waterproof Wall Light,Waterproof Wall Lamp
JINGYING , https://www.jingyingoptical.com