Wooden door installation precautions and acceptance methods

Estimated duration of the wooden doors and windows project: wooden doors and windows project is the project of demon in the time of home decoration. After the basic structure is processed, construction should begin and the project completed before the completion of the project. The specific construction period is two days for the production of the new door woodworking, one day for the renovation, and half an hour for the installation (including hinges, locks, door stoppers, etc.). The varnish coating takes half a day and the rest is the process waiting time.

1. The structure of doors and windows should be strong, smooth and without warping.

2. Door and window frames and door and window sashes with a thickness greater than 50 mm should be connected with double jaws. When the frame and fan are assembled, the gutter shall be tightly fitted, cemented with rubber, and tightened with plastic wedges. There should be full filling between the door frame and the wall.

3, wooden box cut mouth should be straight, the wound should be flat. The switch must be flexible without tilting.

4. The installation position of the door and window hardware is appropriate, the sides of the slots are neat, the types of small hardware are complete, and they are tightened with wood screws, instead of being replaced by nails. Doors and windows covered with water, cover strips, pressure strips, seals the installation of the same size, combined with the doors and windows firmly.

5, doors and windows applied paint or paint should be smooth surface, smooth, no brush marks, uniform color, no leakage coating, sand, spotted and falling and other defects.

Decoration materials knowledge window and window coating wooden door switch home decoration

CON Reducer

Q235 CS CONC Reducers,Concentric Reducer,Reducer Pipe,Reducer Fitting

Cangzhou Youlong Pipe Fitting Manufacturing Co., LTD , https://www.ypco88.com